Profilschienenführungen / HRW / Material wählbar / breiter Wagen

Profilschienenführungen / HRW / Material wählbar / breiter Wagen
A structure with a wide rail width and low center of gravity. HSR It is advantageous when there are Mc moment requirements and is thin compared with.

[Features]
· Circulates the ball row using the end plate that is assembled in the LM block when the ball rotates the rotating side with four rows that have been precision ground into the LM block and LM rail.
· Compact heavy load: A high number of effective balls makes it possible to obtain high rigidity in all directions. Has a wide rail width and can adequately withstand moments with a single shaft.
There is a high rigidity in the horizontal direction and there is no need to for reinforcement such as horizontal pressing due to large secondary moments being incurred on the rail cross-section.
· The self-aligning capability achieved from the unique circular arched-groove front face combination (DF set) makes it possible to absorb the mounting error even when there is a preload incurred, and it is also capable of obtaining a smooth linear motion at a high accuracy.

Teilenummer

Hier finden Sie die Teilenummern
zu dem gesuchten Artikel

Teilenummer
HRW17CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[64-800/1]LUPM
HRW17CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[64-800/1]LUPM
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[64-3000/1]LUP
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[64-3000/1]LUP
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[64-800/1]LUPM
HRW17CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[64-800/1]LUPM
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[72-3000/1]LUP
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[72-3000/1]LUP
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[72-1000/1]LUPM
HRW21CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[72-1000/1]LUPM
HRW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[72-3000/1]LUP
HRW21CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[72-3000/1]LUP
HRW27CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[86-3000/1]LUP
HRW27CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[86-3000/1]LUP
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[86-3000/1]LUP
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1+[86-3000/1]LUP
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C1M+[86-1200/1]LUPM
HRW27CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[86-1200/1]LUPM
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[120-3000/1]LUP
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[120-3000/1]LUP
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]M+[120-2120/1]LUPM
HRW35CA[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[120-2120/1]LUPM
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[120-3000/1]LUP
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[120-3000/1]LUP
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]M+[120-2120/1]LUPM
HRW35CR[1,​2,​3,​4,​5,​6,​7,​8,​9]M+[120-2120/1]LUPM
HRW50CA[1,​2,​3,​4,​5,​6,​7,​8,​9]+[158-3000/1]LUP
HRW50CA[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[158-3000/1]LUP
HRW50CR[1,​2,​3,​4,​5,​6,​7,​8,​9]+[158-3000/1]LUP
HRW50CR[1,​2,​3,​4,​5,​6,​7,​8,​9]C[0,​1]+[158-3000/1]LUP
TeilenummerMindestbestellmengeMengenrabatt
Reguläre
Versanddauer
?
Schienenbreite W1
(mm)
Montagehöhe M
(mm)
Werkstoff Anzahl der mit der Achse kombinierten LM-Blöcke [L] Länge - Schiene
(mm)
Radiales Spiel Präzisionskategorie Nominale Teilenummer Schmiersystem Dynamische Grundtragzahl C
(N)
Statische Grundtragzahl Co
(N)
[MA] Zulässiges statisches Moment
(Nm)
[MB] Zulässiges statisches Moment
(Nm)
[MC] Zulässiges statisches Moment
(Nm)
Abstand Befestigungsbohrung - Führungswagen (Breitrichtung)
(mm)
Abstand Befestigungsbohrung - Führungswagen (Längsrichtung)
(mm)
Durchmesser Befestigungsbohrung - Führungswagen Abstand Befestigungsbohrung - Schiene
(mm)
Durchmesser Befestigungsbohrung - Schiene Das Führungswagen-Außenmaß W
(mm)
Das Führungswagen-Außenmaß L
(mm)
Die Anzahl der Befestigungsbohrungen für Führungswagen
(Stück)
Montagebohrung, Einschraubtiefe
(mm)
Führungswagen-Maß L1
(mm)
1 15 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800Leichte VorspannungExtra-Hochpräzisionsklasse17Schmiermittelanwendung5530910046.446.414453263.3404.56050.86Durchgangsbohrung33.6
1 15 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800NormalExtra-Hochpräzisionsklasse17Schmiermittelanwendung5530910046.446.414453263.3404.56050.86Durchgangsbohrung33.6
1 15 Arbeitstage 3317Kohlenstoffstahl1 ~ 964 ~ 3000NormalExtra-Hochpräzisionsklasse17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 15 Arbeitstage 3317Kohlenstoffstahl1 ~ 964 ~ 3000Leichte VorspannungExtra-Hochpräzisionsklasse17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 15 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800Leichte VorspannungExtra-Hochpräzisionsklasse17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 15 Arbeitstage 3317Edelstahl1 ~ 964 ~ 800NormalExtra-Hochpräzisionsklasse17Schmiermittelanwendung5530910046.446.414429154404.55050.84533.6
1 15 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000NormalExtra-Hochpräzisionsklasse21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 15 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000Leichte VorspannungExtra-Hochpräzisionsklasse21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 15 Arbeitstage 3721Edelstahl1 ~ 972 ~ 1000Leichte VorspannungExtra-Hochpräzisionsklasse21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 15 Arbeitstage 3721Edelstahl1 ~ 972 ~ 1000NormalExtra-Hochpräzisionsklasse21Schmiermittelanwendung80201290078.478.421960294.4504.56858.86Durchgangsbohrung40
1 15 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000NormalExtra-Hochpräzisionsklasse21Schmiermittelanwendung80201290078.478.421931195504.55458.84640
1 15 Arbeitstage 3721Kohlenstoffstahl1 ~ 972 ~ 3000Leichte VorspannungExtra-Hochpräzisionsklasse21Schmiermittelanwendung80201290078.478.421931195504.55458.84640
1 15 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000NormalExtra-Hochpräzisionsklasse27Schmiermittelanwendung142002160016616642370405.3604.58072.86Durchgangsbohrung51.8
1 15 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000Leichte VorspannungExtra-Hochpräzisionsklasse27Schmiermittelanwendung142002160016616642370405.3604.58072.86Durchgangsbohrung51.8
1 15 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000NormalExtra-Hochpräzisionsklasse27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 15 Arbeitstage 4227Kohlenstoffstahl1 ~ 986 ~ 3000Leichte VorspannungExtra-Hochpräzisionsklasse27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 15 Arbeitstage 4227Edelstahl1 ~ 986 ~ 1200Leichte VorspannungExtra-Hochpräzisionsklasse27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 15 Arbeitstage 4227Edelstahl1 ~ 986 ~ 1200NormalExtra-Hochpräzisionsklasse27Schmiermittelanwendung142002160016616642346326604.56272.86651.8
1 15 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000NormalExtra-Hochpräzisionsklasse35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 15 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000Leichte Vorspannung / Mittlere VorspannungExtra-Hochpräzisionsklasse35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 15 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120Leichte Vorspannung / Mittlere VorspannungExtra-Hochpräzisionsklasse35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 15 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120NormalExtra-Hochpräzisionsklasse35Schmiermittelanwendung33800486005595591590107606.8807120106.66Durchgangsbohrung77.6
1 15 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000NormalExtra-Hochpräzisionsklasse35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 15 Arbeitstage 6935Kohlenstoffstahl1 ~ 9120 ~ 3000Leichte Vorspannung / Mittlere VorspannungExtra-Hochpräzisionsklasse35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 15 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120Leichte Vorspannung / Mittlere VorspannungExtra-Hochpräzisionsklasse35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 15 Arbeitstage 6935Edelstahl1 ~ 9120 ~ 2120NormalExtra-Hochpräzisionsklasse35Schmiermittelanwendung3380048600559559159076508807100106.66877.6
1 15 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000NormalExtra-Hochpräzisionsklasse50Schmiermittelanwendung6240086300132013203670144808.6809162140.56Durchgangsbohrung103.5
1 15 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000Leichte Vorspannung / Mittlere VorspannungExtra-Hochpräzisionsklasse50Schmiermittelanwendung6240086300132013203670144808.6809162140.56Durchgangsbohrung103.5
1 15 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000NormalExtra-Hochpräzisionsklasse50Schmiermittelanwendung62400863001320132036701006510809130140.5615103.5
1 15 Arbeitstage 9050Kohlenstoffstahl1 ~ 9158 ~ 3000Leichte Vorspannung / Mittlere VorspannungExtra-Hochpräzisionsklasse50Schmiermittelanwendung62400863001320132036701006510809130140.5615103.5

Loading...

  1. 1

Grundlegende Informationen

Ausführung - Führungswagen Breit Ausführung - Schiene Breite Führungsschiene Kugelausrichtung 4-reihig, rund
Kugelkäfige NA Ausführung - Wälzkörper Kugel Set / Einzelteile Produktsatz
Befestigungsbohrung für Führungswagen Gewindebohrung

Technischer Support