Teilenummer |
Standard-Stückpreis
| Mindestbestellmenge | Mengenrabatt | Tool Diameter (mm) | radius R | Both square | Blade tip ℓ (mm) | Blade Length ℓ1 (mm) | Shank Lower Length ℓ2 (mm) | Overall Length L (mm) | shank diameter d1 (mm) | Pilot Hole Mounting φ | Cutting feed mm/rev | Blade diameter tolerance | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
193.30 € | 1 | 6 Arbeitstage | 11.03 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.04 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.05 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.06 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.07 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.08 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.09 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.1 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
193.30 € | 1 | 6 Arbeitstage | 11.2 | - | - | 7 | 29 | 105 | 155 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.3 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.4 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.5 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.6 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.7 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.8 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 11.9 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
143.87 € | 1 | 6 Arbeitstage | 12 | - | - | 7 | 29 | 105 | 160 | 12 | 0.2~0.4 | 0.15–0.3 | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.01 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.02 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.03 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.04 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.05 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.06 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.07 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.08 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.09 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.1 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
209.92 € | 1 | 6 Arbeitstage | 12.2 | - | - | 7 | 29 | 105 | 160 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.3 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.4 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.5 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.6 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.7 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.8 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
227.41 € | 1 | 6 Arbeitstage | 12.9 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
155.71 € | 1 | 6 Arbeitstage | 13 | - | - | 7 | 29 | 110 | 165 | 12 | 0.2~0.4 | 0.15–0.3 | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.01 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.02 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.03 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.04 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.05 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.06 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.07 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.08 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.09 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.1 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
226.43 € | 1 | 6 Arbeitstage | 13.2 | - | - | 7 | 29 | 110 | 165 | 12 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.3 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.4 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.5 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.6 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.7 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.8 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 13.9 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
168.74 € | 1 | 6 Arbeitstage | 14 | - | - | 7 | 29 | 115 | 170 | 16 | 0.2~0.4 | 0.15–0.3 | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 14.01 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 14.02 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 14.03 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 14.04 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 | ||
245.55 € | 1 | 6 Arbeitstage | 14.05 | - | - | 7 | 29 | 115 | 170 | 16 | - | - | +0.006~+0.010 |
Loading...
work material | Stahl allgemein / Gusseisen / Aluminium / Legierter Stahl | Coating Y/N | N/A | Twist | Left-hand thread 60° |
---|---|---|---|---|---|
Tool Material Type | Carbide |
Konfigurieren
Basiseigenschaften
Tool Diameter(mm)
radius R
Both square
Blade tip ℓ(mm)
Blade Length ℓ1(mm)
Shank Lower Length ℓ2(mm)
Overall Length L(mm)
shank diameter d1(mm)
Ausführung
Filtern nach vsl. Lieferzeit
Optionale Eigenschaften